Season 2
01 Crane Down
45mOne of Australia's largest hydro power stations undertakes a high stakes valve replacement; they have six hours to get the 800kg replacement part down six stories.
2021-09-0602 Piece By Piece
45mThe Kooragang Coal Terminal is buzzing with the arrival of a newly designed Ship Loading Spout and Trimmer Flap.
2021-09-1303 Rush Hour
45mIn Central Queensland, the army mechanics from the 2nd/14th Light Horse Regiment have two hours to overhaul a tank suspected of hoarding unwanted debris.
2021-09-2004 Back On Track
45mThe mechanics at Brisbane's Gallipoli Barracks's Light Horse Regiment aim to complete two huge tasks.
2021-08-2305 Sky High Stakes
45mThe team at Murray 1, Snowy Hydro's second-largest power station, reassemble a massive power turbine after they find extensive cracking in the top cover.
2021-09-2706 Slowly But Surely
45mA week-long mechanical marathon for the team of Queensland Rail mechanics, as they work to hoist a six-tonne V12 engine.
2021-08-0907 Feeling the Heat
45mThe team from Lindores Construction Logistics have one day to relocate a massive tower crane on the Queens Wharf development in Brisbane.
2021-10-0408 Risky Repairs
45mSouth of Jindabyne, a mini hydro station has long-awaited repair work done, thanks to the arrival of a brand new submerged discharge valve.
2021-08-3009 Blast Off!
45mTensions are high at the Gilmour Space Technologies test facility on the Gold Coast, where the team prepares to put their brand new rocket through its second test.
2021-08-1610 Time is Money
45mIn Sydney, Leichhardt Bus Depot, one of the largest in the Southern hemisphere, the team has to scramble to repair two buses before the morning rush hour.
2021-10-11