Season 1

01 All Aboard An Australian Icon
45mThe iconic Ghan needs some bogies changed fast, a routine wheel lathe job hits a snag, plus an 80 year old steam loco climbs a mountain for a special anniversary.
2025-05-20
02 Getting a Freight Train to the Finish Line
45mThe Spirit of Queensland’s maintenance team race to change a bogie, the construction of a freight locomotive nears completion, and a breakdown crew hustles to get a commuter train back on track.
2025-05-2703 High Stakes Engine Rebuild
45mSkilled technicians battle with a stubborn alternator, a crew tackle a high-stakes engine rebuild for a freight train, plus it takes a team of experts to build a massive locomotive underframe.
2025-06-0304 Getting A Cane Loco Back To Harvest
45mA loco needs a double bogie change to get back to the sugarcane harvest, traction motors from mining trains are getting rebuilds, plus the heat is on for a tricky air conditioner replacement.
2025-06-1005 One Day Mission To Replace Freight Engine
45mA freight train needs an urgent engine replacement after a critical failure, a 132 T loco requires a complex bogie change, plus catch the special forces of rail, the RORU team, in action.
2025-06-17
06 Single Day Traction Motor Challenge
45mA commuter train undergoes a tough traction motor replacement, one maintenance team takes on two huge jobs, plus a leaky torque seal sidelines a sugarcane loco urgently needed for the harvest.
2025-06-2407 High Precision Gear Box Overhaul
45mA finicky one tonne gearbox, a tight squeeze into a vintage loco during a boiler service, plus shunting a train across 3 rail crossings at peak hour - just another busy day in railway maintenance
2025-07-01
08 Rusty Water Tank Cut Off Steam Loco
45mA rusty 10 tonne water tank gets cut off a vintage steam loco, a challenging 4-car passenger train lift & bogie change, plus Kuranda Scenic Railway carriages get spruced up by the carpentry team.
2025-07-08
09 Loco Maintenance Team Expect The Unexpected
45mA busy loco maintenance team that always expect the unexpected, a challenging 8 tonne water tank installation on a vintage loco, plus an electronics team on a mission to stop e-waste in its tracks.
2025-07-1510 The Heat is on to Crane in a Rooftop
45mMaintenance teams pool their brain power to test pantographs, fix a leaking air conditioner, remove debris from high voltage train power lines.
2025-07-22
